1. A lack of automation with safeguards for DNS changes
2. Insufficient guardrails to enforce the Change Management process
3. Subversion of the Emergency Break Fix (EBF) process
It looks a lot like somebody tried to push their agenda (personal or organizational) and write points that suit their preferred solution rather than try to understand actual causes of the outage.
These findings are essentially "Somebody made a mistake, let's remove accesses and/or put more controls on the process so that people are not even able to make a mistake".
This seems to be very low trust environment. My experience tells me the most likely course of action is that even if the problem is fixed, it is going to happen at the cost of more overhead in the process and making it even more low-trust, causing more damage in the long run.
You can apply this kind of flawed reasoning ("somebody made a mistake -- nobody can be trusted with it again") to any problem and soon nobody can do anything on their own. Productivity plummets. People are becoming disinterested in their work (try to be "engaged" when management takes all your tools away). Management blames people for not being able to do even basic things -- loosing even more trust and pushing even more solutions like that. Vicious cycle.
Take for example point #3.
How about figuring out WHY people need or feel they need to subvert EBF process? Isn't it rational to assume that if people have been subverting the process they might have actual reason to do so? Maybe their regular process is too onerous and they are using emergency process to meet deadlines? Maybe the effort should be directed at improving the regular process so that they don't have reason to subvert it?
I see that a lot in RCAs - it's generally easy to rush out how something went wrong, but it can be much more subtle why it did; but since heads will roll if it isn't sent in 24hr, we get useless recaps.
This isn't low trust but rather poka-yoke mistake proofing. If you have a fallible process you either replace it with an infallible one or put in controls to mitigate the risk. When you effectively run a factory for configuring software you have an interest in not letting a single production worker shut down the whole operation.
Trust requires that you accept that you can be hurt by the person you trust. If you work to remove that ability you are saying you do not trust that other person.
Now, I am not saying that you should design processes so that employees can fail them.
What I am saying is that when somebody is a developer and the company says it is ok to "burn" their time and effort because they do not trust the developer to make a right decision, it sucks and it makes it very difficult for that person to care to do a good job.
There are usually different ways to prevent things from failing that do not require the organization to manifest that it does not trust their employees. And there are ways for the organization to show they trust their employees to make up for the cases when these types of solutions can't be implemented.
I worked in Samsung. In the office I worked, there is a ban on having knives in the kitchen, even the cutlery that is basically unusable to cut anything more substantial than overcooked potatoes. I heard the same for all other offices. Apparently, two guys half a world away had a knife fight in the kitchen and so it was decided every single employee is not to be trusted handling cutlery. The funny thing is, people started bringing their own, really sharp knives. So... knives are still there but employees have one more reminder that they are not being treated as adults.
I worked in a large number of companies, from small to very, very large ones. They all vary a lot in the level of permission any single employee has to do things.
But one thing I noticed is that companies where employees have very little permission to do anything do not have less process failures.
There is many reasons for this. Now that you made your employees impotent, you need a lot more of them to do the same work. Or maybe you need to shift the responsibilities from real thinking people to automation that can also make mistakes but with a much larger impact. People that are constantly reminded they are not trusted start behaving this way. They tend to lower standards and stop caring.
Taking somebodys permission to do something can be done well but it usually requires much more care and thought than what typically happens at large corporations.
I understand this. The difference is that when somebody implements RCA findings this usually results in mandatory overhead. That is not the case with a wooden jig which you can decide to skip if it does not suit your next item you are working on.
And that is the point. If I gave you the wooden jig to help you make better job but allowed you to skip it when you know better -- it shows that I trust your judgement and I only care to give you tools to help you make better job (safer).
But if I give you wooden jig and tell you you are going to be fired if I see you not using it regardless of how little sense it makes just because some other employee showed bad judgment once, I am saying that I do not care for you as an individual and not only I do not trust you, I do not trust you so much that I would willingly cripple your ability to do good job just to make it less likely you make a particular type of error.
I think this is pretty misguided. If reliability is at all important, you need controls in place so that a single person making a single mistake won't cause an outage. Software engineers are human and humans make mistakes. That's just the reality. That isn't indicative of a lack of trust, but rather an acknowledgement of the constraints we are operating under.
Its possible that people subverting these processes are doing so because there are some actual flaws in the processes, but generally it is just as likely that they are being lazy or just don't think there is any way they would ever make a mistake. That isn't to say that it isn't worth evaluating the processes and the tradeoffs they impose, just that I think you are definitely throwing the baby out with the bathwater.
The most astonishing thing is that people actually believe that crap.
That the solution to people making mistakes is taking away any power to do anything substantial on their own. No power to do anything == no power to do any damage.
Think how a machine shop would work if we applied the same rules. "No, you can't use CNC machine because somebody broke an expensive part once. You need to fill this form, prepare this feasibility study and wait for director approval for every change to the program. Of course, director has absolutely no knowledge to validate your CNC routine but this is the process."
I worked for those organizations, just left one. You get hundreds of people do work that couple smart engineers without artificial limitations could do in a fraction of time.
Unless the CNC machine is the entire business, breaking a part isn't an outage. It's just an financially expensive mistake. On the other hand, if you have a building running life-support machines, you probably don't want someone messing with the breaker box that connects to them without designing some protections and backups.
There's some good stuff here, but it also feels like it's a deep analysis of a straw man rather than of real industry practice.
> At its core, RCA posits that an incident has a single, specific cause or trigger, without which the incident wouldn’t have happened
Does it?
None of the teams I've worked with that practice root-cause analysis, or use the term 'root cause' assume that incidents have a single specific cause or trigger. In fact, most teams seem very comfortable exploring complex trees of causality, no matter what they call their post-mortem process.
> None of these alternatives are fixed as easily as reverting the one line. None of them suggest that they stem from the same ‘root.’ And yet, all of these alternatives are more fundamental to resilience than the one line of a configuration file.”
“In the beginning the Universe was created. This has made a lot of people very angry and been widely regarded as a bad move.” (Douglas Adams)
There has to be a logical stopping point to investigations, because at some point they just become metaphysics. Even getting to the point of "we don't make enough revenue to fix this" isn't really helpful, because everybody knows that already. Instead, and somewhat crucially, choosing which actions to take after an event needs to be done in context of the constraints on the business. Sometimes those constraints are a problem, but it may be possible to improve the situation even within those constraints. Throwing our hands up and saying that we can't make improvements because of the constraints isn't really that helpful.
Dekker is spot-on that it's a construction, but that's the point, not the problem.
> Our focus on language in reports is informed by research into the relationship between language and how people perceive and/or assign blame.
I just don't believe this. Bad organizations are going to assign blame no matter what language they use, better organizations won't. The problem is the culture, not the language, and it really doesn't seem to me that changing the language will change the culture. Instead, it'll just lead to double-speak.
They even say this:
> RCA is often a path that ends squarely at a person’s feet. “Human error” is a quick and easy scapegoat for all kinds of incidents and accidents, and it’s deceptive simplicity as a root cause is an inherent part of its larger-scale harmful effects. It’s comforting to frame an incident as someone straying from well-established rules, policies, or guidelines; simply provide more training, and more guardrails and checklists in the future!
then this:
> we can say now that there’s only a small amount of incidents (less than a percent) that directly call out human or operator error as a “root cause.”
Rules of evidence also arose to prevent investigations and analyses from getting lost in the weeds. See https://en.wikipedia.org/wiki/Evidence_(law) Though they're highly tuned to witness testimony and similar mushy issues--intent, etc--so don't translate well. But whenever you hear about a court tossing out evidence, or doing something seemingly inane like (in a recent high-profile case) preventing a juror from using a smartphone to "zoom in" to a piece of evidence, it's precisely this role that is being (or attempted to be) primarily served--preventing scope creep and the endless bickering that will inevitably result. The rabbit hole is bottomless, and whatever stopping points you choose are often arbitrary--they especially seem so to outsiders.
I agree. This seems to conflate immediate direct causes and lack of mitigations or robustness.
By that logic, I'm missing "questionable dietary habits of the lead engineer" and "failure of the building architechts to create a more calming office environment" as causes in the article.
The author strikes me as someone focused on something other than incident and problem management. The answers or depend on what you’re looking at.
The cause of the incident used in the example is the configuration change. Resolution is rollback.
When you look at problem management, the root causes of the problem are likely process issues that need to be addressed. (Or not)
Think of a non tech example to help understand. Look at a picture of an early superhighway from the 1950s like the New York State Thruway, New Jersey Turnpike, etc. Notice that there are no guardrails or they are made of wood.
When a 1950s driver fell asleep and ran off the road, flipping and getting ejected from the car, he died. The cause of the incident was him falling asleep and losing control.
But for the highway engineer, many problems are introduced by this incident. The shoulder could be graded to avoid rollover. Appropriate barriers could prevent the rollover. Rumble strips wake up the driver. For the mechanical engineer at a car company, seatbelts prevent ejection, safety glass prevents eviceration, crumple zones prevent trauma.
None of those things prevent the guy from falling asleep in that incident. But they address the greater problem of highway fatality.
Right, but those aren't things an RCA is meant to address. The RCA identifies the specific method of failure. It's the starting point on your process improvement. X failed because Y, why did we allow Y to occur? The answers to those questions become deliverables.
An RCA doesn't handle those things because another section does. That way each team involved can look at what the issue was and how their team can prevent that. The authors solution eeks of a central committee that tells you how you could have prevented it, and they're often ineffective.
There may be multiple and complex root causes. The point is to analyse a problem beyond its immediate symptoms in order to get to the 'root' cause(s) and improve quality in depth.
It's not an 'artificial stopping point', either, as the article also claim.
Maybe just like the title, the distinction is whether you interpret root as in the plant part or as in the data structure.
In a plant, starting from the trunk, and going towards the source, a root branches into smaller and smaller bits. On topic, the root cause would be a combination of multiple contributing factors all coming together.
In a tree data structure, the root is a singular node. On topic, the root cause would be a singular reason.
I never understood why in computer science, the root if a tree data structure is called the root and not the trunk.
Root cause analysis has nothing to do with data structures. Obviously it's an idiom ("the root of the problem") based on the plant part (like 'tree' data structures). In any case there is not point arguing on such semantics, especially if it's to argue on overly narrow definitions.
The "root cause" of an issue is very often not singular and therefore "root cause analysis" is not an attempt to find a singular cause.
Root cause analysis is almost always just blame-shifting and trying to find somebody to fall on the sword and accept culpability, and often as not, pay for the downtime/missed SLAs/etc...
Maybe there are some enlightened organizations out there that treat it as a learning opportunity, but I've never seen it from any of the Fortune 500s that demand a RCA from me when something derps up on their end.
I do not agree with the thrust of this article. Some of the issues raised only arise because of the the sloppy or incorrect identification of root cause by software people, which then falls into a definitional whack-a-mole-game. Not helpful at all.
Now, the author rightly argues that coming up with RCA isn't easy. In particular it tends to follow a twin inverted V shape:
<--- starting wide various technical/operation issues considered
\_/
+ <--- narrowing to the root"ist" technical cause
/-\
<--- widening back into organization issues as to why an
agent of change could do or did do something
In addition, unlike manufacturing, there is no sense of 6-sigma riding on top of a domain of work governed by natural science so that arriving at a quantitatively convincing argument of root cause is generally not possible.
points out that technical issues often dissolve into organizational issues. See page 57-58 then elsewhere.
So where does that leave one? Dealing with the many contributing factors in an organization that impinge on decisions which may lead to bugs/outages/defects:
- Eliminate opportunity defects. Simplify.
- Inputs to the next process should be controlled (in manufacturing parlance they are X-sigma quality). It's harder for me to screw something up if what I start with conforms to its requirements aligned ultimately with customer satisfaction.
- quality is everybody's problem. See again pg57-58. Sectionalism is a major impediment to enterprise wide improvement
- the ultimate aim is continuous improvement of which RCA (fish bone diagrams and the rest) are but tools. The salient business question is: ok, a client outage occurred. Not OK, but does it repeat?
Root cause analysis? Plants are doing just fine. Human organizations can be helped by root cause analysis. That's just how it is.
In my opinion, its called root cause analysis and not a root cause pointer. No matter what you call it, its a good idea to understand the events that lead to an incident. We cannot improve if we do not know where/how we failed.
RCA is a tool. It can be everything the article says it is. It can also be incredibly useful by not being what the article says it has to be.
For instance I've heard there's at the very least an FAA institutional push against plane crash RCAs simply saying "pilot error". Pilots are known to make errors (we all do), so the FAA wants to know how the error wasn't accounted for in the greater process and resulted in a plane falling out of the sky. If you use RCA not for blame, or don't call it quits after finding a "smoking gun", it's a fantastic tool for enumerating single points of failure that you can prove actually failed. There's normally multiple things you can do better if multiple people care about what comes out of an RCA.
i always thought that finding "the root cause" was simply a declaration by those investigating that they're either satisfied with what they've learned or are bored of investigating.
at the end of the day, only a few things matter. which component is actually broken? since it's not always obvious, so that the immediate situation may be resolved expeditiously. what was the event that triggered it such that process or tooling around it might be improved? where might investment be made to prevent the same or similar happening in future?
RCA is a complex path that can be explored in a variety of ways.
The 5 whys analysis is one of the better ways to go about RCA in my experience. Especially, if everyone can be mature adults and amend it as appropriate to the circumstances at hand. For example, you might only need to ask "why" 3 times before it becomes overly-reductive. Sometimes 15. Also, you might find that the answer to each "why" is a collection of things, each seeking their own new tree of exploration.
I have witnessed some hilariously-deep RCA pools. If you ever work in systems engineering for a semiconductor manufacturer, you will see some of the most insane shit. Like tracing a series of customer device failures back to the exact human contractor who brought a naughty tool into an inappropriate area of the facility for a brief duration, causing a chain of events 100+ deep, ultimately resulting in elevated defects in all batches of wafers that were ran through a specific port on a specific tool.
In this context, I think the C is plural. Very few complex issues are attributable to exactly 1 logical thing.
"Cause is not something you find. Cause is something you construct. How you construct it and from what evidence, depends on where you look, what you look for, who you talk to, what you have seen before, and likely on who you work for."
This is not a universally true statement. It is only true when you don't have enough information. The statement confuses the physical world with our mental representation of it.
31 comments
[ 2.8 ms ] story [ 75.4 ms ] threadThese findings are essentially "Somebody made a mistake, let's remove accesses and/or put more controls on the process so that people are not even able to make a mistake".
This seems to be very low trust environment. My experience tells me the most likely course of action is that even if the problem is fixed, it is going to happen at the cost of more overhead in the process and making it even more low-trust, causing more damage in the long run.
You can apply this kind of flawed reasoning ("somebody made a mistake -- nobody can be trusted with it again") to any problem and soon nobody can do anything on their own. Productivity plummets. People are becoming disinterested in their work (try to be "engaged" when management takes all your tools away). Management blames people for not being able to do even basic things -- loosing even more trust and pushing even more solutions like that. Vicious cycle.
Take for example point #3.
How about figuring out WHY people need or feel they need to subvert EBF process? Isn't it rational to assume that if people have been subverting the process they might have actual reason to do so? Maybe their regular process is too onerous and they are using emergency process to meet deadlines? Maybe the effort should be directed at improving the regular process so that they don't have reason to subvert it?
Trust requires that you accept that you can be hurt by the person you trust. If you work to remove that ability you are saying you do not trust that other person.
Now, I am not saying that you should design processes so that employees can fail them.
What I am saying is that when somebody is a developer and the company says it is ok to "burn" their time and effort because they do not trust the developer to make a right decision, it sucks and it makes it very difficult for that person to care to do a good job.
There are usually different ways to prevent things from failing that do not require the organization to manifest that it does not trust their employees. And there are ways for the organization to show they trust their employees to make up for the cases when these types of solutions can't be implemented.
I worked in Samsung. In the office I worked, there is a ban on having knives in the kitchen, even the cutlery that is basically unusable to cut anything more substantial than overcooked potatoes. I heard the same for all other offices. Apparently, two guys half a world away had a knife fight in the kitchen and so it was decided every single employee is not to be trusted handling cutlery. The funny thing is, people started bringing their own, really sharp knives. So... knives are still there but employees have one more reminder that they are not being treated as adults.
I worked in a large number of companies, from small to very, very large ones. They all vary a lot in the level of permission any single employee has to do things.
But one thing I noticed is that companies where employees have very little permission to do anything do not have less process failures.
There is many reasons for this. Now that you made your employees impotent, you need a lot more of them to do the same work. Or maybe you need to shift the responsibilities from real thinking people to automation that can also make mistakes but with a much larger impact. People that are constantly reminded they are not trusted start behaving this way. They tend to lower standards and stop caring.
Taking somebodys permission to do something can be done well but it usually requires much more care and thought than what typically happens at large corporations.
If someone forced me to use their jigs taylor-made to their workflow (however scientifically managed), that would be a low-trust environment.
And that is the point. If I gave you the wooden jig to help you make better job but allowed you to skip it when you know better -- it shows that I trust your judgement and I only care to give you tools to help you make better job (safer).
But if I give you wooden jig and tell you you are going to be fired if I see you not using it regardless of how little sense it makes just because some other employee showed bad judgment once, I am saying that I do not care for you as an individual and not only I do not trust you, I do not trust you so much that I would willingly cripple your ability to do good job just to make it less likely you make a particular type of error.
Its possible that people subverting these processes are doing so because there are some actual flaws in the processes, but generally it is just as likely that they are being lazy or just don't think there is any way they would ever make a mistake. That isn't to say that it isn't worth evaluating the processes and the tradeoffs they impose, just that I think you are definitely throwing the baby out with the bathwater.
That the solution to people making mistakes is taking away any power to do anything substantial on their own. No power to do anything == no power to do any damage.
Think how a machine shop would work if we applied the same rules. "No, you can't use CNC machine because somebody broke an expensive part once. You need to fill this form, prepare this feasibility study and wait for director approval for every change to the program. Of course, director has absolutely no knowledge to validate your CNC routine but this is the process."
I worked for those organizations, just left one. You get hundreds of people do work that couple smart engineers without artificial limitations could do in a fraction of time.
> At its core, RCA posits that an incident has a single, specific cause or trigger, without which the incident wouldn’t have happened
Does it?
None of the teams I've worked with that practice root-cause analysis, or use the term 'root cause' assume that incidents have a single specific cause or trigger. In fact, most teams seem very comfortable exploring complex trees of causality, no matter what they call their post-mortem process.
> None of these alternatives are fixed as easily as reverting the one line. None of them suggest that they stem from the same ‘root.’ And yet, all of these alternatives are more fundamental to resilience than the one line of a configuration file.”
“In the beginning the Universe was created. This has made a lot of people very angry and been widely regarded as a bad move.” (Douglas Adams)
There has to be a logical stopping point to investigations, because at some point they just become metaphysics. Even getting to the point of "we don't make enough revenue to fix this" isn't really helpful, because everybody knows that already. Instead, and somewhat crucially, choosing which actions to take after an event needs to be done in context of the constraints on the business. Sometimes those constraints are a problem, but it may be possible to improve the situation even within those constraints. Throwing our hands up and saying that we can't make improvements because of the constraints isn't really that helpful.
Dekker is spot-on that it's a construction, but that's the point, not the problem.
> Our focus on language in reports is informed by research into the relationship between language and how people perceive and/or assign blame.
I just don't believe this. Bad organizations are going to assign blame no matter what language they use, better organizations won't. The problem is the culture, not the language, and it really doesn't seem to me that changing the language will change the culture. Instead, it'll just lead to double-speak.
They even say this:
> RCA is often a path that ends squarely at a person’s feet. “Human error” is a quick and easy scapegoat for all kinds of incidents and accidents, and it’s deceptive simplicity as a root cause is an inherent part of its larger-scale harmful effects. It’s comforting to frame an incident as someone straying from well-established rules, policies, or guidelines; simply provide more training, and more guardrails and checklists in the future!
then this:
> we can say now that there’s only a small amount of incidents (less than a percent) that directly call out human or operator error as a “root cause.”
Which just don't seem consistent.
The law understands this point very well, which is why it has developed concepts like Proximate cause: https://en.wikipedia.org/wiki/Proximate_cause
Rules of evidence also arose to prevent investigations and analyses from getting lost in the weeds. See https://en.wikipedia.org/wiki/Evidence_(law) Though they're highly tuned to witness testimony and similar mushy issues--intent, etc--so don't translate well. But whenever you hear about a court tossing out evidence, or doing something seemingly inane like (in a recent high-profile case) preventing a juror from using a smartphone to "zoom in" to a piece of evidence, it's precisely this role that is being (or attempted to be) primarily served--preventing scope creep and the endless bickering that will inevitably result. The rabbit hole is bottomless, and whatever stopping points you choose are often arbitrary--they especially seem so to outsiders.
By that logic, I'm missing "questionable dietary habits of the lead engineer" and "failure of the building architechts to create a more calming office environment" as causes in the article.
The cause of the incident used in the example is the configuration change. Resolution is rollback.
When you look at problem management, the root causes of the problem are likely process issues that need to be addressed. (Or not)
Think of a non tech example to help understand. Look at a picture of an early superhighway from the 1950s like the New York State Thruway, New Jersey Turnpike, etc. Notice that there are no guardrails or they are made of wood.
When a 1950s driver fell asleep and ran off the road, flipping and getting ejected from the car, he died. The cause of the incident was him falling asleep and losing control.
But for the highway engineer, many problems are introduced by this incident. The shoulder could be graded to avoid rollover. Appropriate barriers could prevent the rollover. Rumble strips wake up the driver. For the mechanical engineer at a car company, seatbelts prevent ejection, safety glass prevents eviceration, crumple zones prevent trauma.
None of those things prevent the guy from falling asleep in that incident. But they address the greater problem of highway fatality.
An RCA doesn't handle those things because another section does. That way each team involved can look at what the issue was and how their team can prevent that. The authors solution eeks of a central committee that tells you how you could have prevented it, and they're often ineffective.
It does not, indeed.
There may be multiple and complex root causes. The point is to analyse a problem beyond its immediate symptoms in order to get to the 'root' cause(s) and improve quality in depth.
It's not an 'artificial stopping point', either, as the article also claim.
In a plant, starting from the trunk, and going towards the source, a root branches into smaller and smaller bits. On topic, the root cause would be a combination of multiple contributing factors all coming together.
In a tree data structure, the root is a singular node. On topic, the root cause would be a singular reason.
I never understood why in computer science, the root if a tree data structure is called the root and not the trunk.
Computer scientists are bad botany.
The "root cause" of an issue is very often not singular and therefore "root cause analysis" is not an attempt to find a singular cause.
Maybe there are some enlightened organizations out there that treat it as a learning opportunity, but I've never seen it from any of the Fortune 500s that demand a RCA from me when something derps up on their end.
Read: https://www.amazon.com/What-Total-Quality-Control-Japanese/d...
and do better. You have choice. Use it.
Now, the author rightly argues that coming up with RCA isn't easy. In particular it tends to follow a twin inverted V shape:
\_/+ <--- narrowing to the root"ist" technical cause
/-\
In addition, unlike manufacturing, there is no sense of 6-sigma riding on top of a domain of work governed by natural science so that arriving at a quantitatively convincing argument of root cause is generally not possible.Even the book on TQM in 6-sigma work:
https://www.amazon.com/What-Total-Quality-Control-Japanese/d...
points out that technical issues often dissolve into organizational issues. See page 57-58 then elsewhere.
So where does that leave one? Dealing with the many contributing factors in an organization that impinge on decisions which may lead to bugs/outages/defects:
- Eliminate opportunity defects. Simplify.
- Inputs to the next process should be controlled (in manufacturing parlance they are X-sigma quality). It's harder for me to screw something up if what I start with conforms to its requirements aligned ultimately with customer satisfaction.
- quality is everybody's problem. See again pg57-58. Sectionalism is a major impediment to enterprise wide improvement
- the ultimate aim is continuous improvement of which RCA (fish bone diagrams and the rest) are but tools. The salient business question is: ok, a client outage occurred. Not OK, but does it repeat?
Root cause analysis? Plants are doing just fine. Human organizations can be helped by root cause analysis. That's just how it is.
For instance I've heard there's at the very least an FAA institutional push against plane crash RCAs simply saying "pilot error". Pilots are known to make errors (we all do), so the FAA wants to know how the error wasn't accounted for in the greater process and resulted in a plane falling out of the sky. If you use RCA not for blame, or don't call it quits after finding a "smoking gun", it's a fantastic tool for enumerating single points of failure that you can prove actually failed. There's normally multiple things you can do better if multiple people care about what comes out of an RCA.
at the end of the day, only a few things matter. which component is actually broken? since it's not always obvious, so that the immediate situation may be resolved expeditiously. what was the event that triggered it such that process or tooling around it might be improved? where might investment be made to prevent the same or similar happening in future?
that's basically it.
The 5 whys analysis is one of the better ways to go about RCA in my experience. Especially, if everyone can be mature adults and amend it as appropriate to the circumstances at hand. For example, you might only need to ask "why" 3 times before it becomes overly-reductive. Sometimes 15. Also, you might find that the answer to each "why" is a collection of things, each seeking their own new tree of exploration.
I have witnessed some hilariously-deep RCA pools. If you ever work in systems engineering for a semiconductor manufacturer, you will see some of the most insane shit. Like tracing a series of customer device failures back to the exact human contractor who brought a naughty tool into an inappropriate area of the facility for a brief duration, causing a chain of events 100+ deep, ultimately resulting in elevated defects in all batches of wafers that were ran through a specific port on a specific tool.
In this context, I think the C is plural. Very few complex issues are attributable to exactly 1 logical thing.