3 comments

[ 3.1 ms ] story [ 18.7 ms ] thread
I'm assuming that's why tradesmen charge at rates more than a principal-level developer makes for their visits.
Either Seattle is very smart, or standards have dropped.
Could it be that Microsoft is the cause?