[–] yusufaytas 15d ago ↗ The hidden costs slowing engineering teams down: cognitive load, process bottlenecks, status theatre, context switching, and the tax that drains velocity.
1 comment
[ 2.8 ms ] story [ 14.4 ms ] thread