12 comments

[ 4.1 ms ] story [ 25.9 ms ] thread
Pilot to place solar panels in the space between train tracks shown to be a success.
A lot of people doubted this could work. After all, railway tracks are a dusty, hot environment with tons of vibrations that could cause microcracks.

I was in the doubter team too, but if this really worked out, that's great news. Congrats to the project team! Will be interesting to see if this scales well.

The panels probably need 5-8 years in that location to be energy positive. A year is great, but doesn’t prove much.
Could they at least get a well-lit picture of panels that aren't covered in dirt and rocks? This is a lying eyes situation now. Depressing.
What are the advantages to putting them between the rails, where you need trains to stop running in order to access them?

If it's about using wasted land, why not put them beside the rails, which would make access easier? There is usually a generous margin beside the tracks.

This would also allow bigger panels to be used.

I think the idea is that you can make a machine that goes on the rails and installs them automatically. So you don't need to haul a bunch of equipment on site, you just drive one special train down the track once.
Same for washing the panels. Could even work a system onto already-running trains.

And the RightOfWay is already maintained to keep tall grasses/trees away that may fall on a line.

Often the line is already built-up for flood prevention.

In some (most? All?) countries, the railway has free reign and doesn’t need to answer to city/municipal/states/provinces for approvals on anything.

I think the biggest advantage rails have is that they are electrified and are accessible by rail based maintenance vehicles. Panels have gotten so inexpensive that the major cost is usually the mounting, installation, and electrical access. Some of that is mitigated by installing on railways. You can automate the installation process and connect into the tram lines.
"generous margin beside the tracks" is being, well, generous. there often isn't that much space, and it often already has cabling, phoneline, pipes, or other stuff there.

augur cars overturn the soil and lay pipe but now the fiber optic lines would compete with the solar.

meanwhile track lines are untapped, and often use electricity or having wiring for local induction loop

I often wonder about some of the more critical comments on projects like this. It should be welcomed by everybody that someone even tries. If it doesn't work - well at least we know. If it does - even better. Anyone who has ever started a hardware company like this group would know who challenging this can be no matter what. But to do that in such a highly regulated environment? Methinks it is very impressive that they got that far and hopefully will go further!