Really interesting angle — I've been working on the post-build side of this problem (finding waste in production LLM spend) and the pre-build estimation gap is something I hadn't thought about. The two tools solve…
Really interesting angle — I've been working on the post-build side of this problem (finding waste in production LLM spend) and the pre-build estimation gap is something I hadn't thought about. The two tools solve…