That was my thought as well, but I couldn't justify it being root 2 so I went with the number I got.
The multiplier of 4.11 was for a tile of length for the test mazes, which is actually 2 more tiles of maze. Every tile has 2 indents so one tile of length has 2*2=4 indents. Therefore we need to take the fourth root to…
OpenRCT2, the open-source project that improves RCT2, has some of these features as well. It has a scenery picker and it also has a ghost train feature for rides under construction. It also makes it run much smoother on…
That was my thought as well, but I couldn't justify it being root 2 so I went with the number I got.
The multiplier of 4.11 was for a tile of length for the test mazes, which is actually 2 more tiles of maze. Every tile has 2 indents so one tile of length has 2*2=4 indents. Therefore we need to take the fourth root to…
OpenRCT2, the open-source project that improves RCT2, has some of these features as well. It has a scenery picker and it also has a ghost train feature for rides under construction. It also makes it run much smoother on…