400 definitely feels like a lot of data centers when just 52 in Alberta would be similar to Michigan.
Google tells me Michigan uses 11–12 GW on average, and summer peaks reach roughly 22–24 GW.
In Alberta, companies have requested ~19.6 GW for only ~52 new datacenter's. O’Leary’s proposed off-grid Wonder Valley campus is pitched at 7.5 GW of generation on its own.
The GDP of Michigan is $734B. The combined cloud computing revenues of Google, AWS, and Microsoft (which make up a large fraction of this datacenter work, though not all of it) are $290B. So yes, we should expect the power usage of these things to be in the same order of magnitude.
Why calculate the cloud computing revenues and not the economic activity facilitated by the existence of cloud computing? You're measuring multiple orders of economic activity by using Michigan GDP but only one order using google, aws, and msft cloud revs.
It’s a very high level calculation that I could do in 60 seconds to see if the article is saying something interesting or not. It’s definitely incomplete and those datacenters are probably powering much more economic activity. Doing this analysis would be helpful but I suspect not very enlightening.
We're also not counting the petroleum powering the cars everyone is driving and the natural gas used as the primary source of building heat.
Electricity is useful for so many things, but it's not needed in huge amounts in an ordinary Michigander's life today. I wish they'd switch to EVs and heat pumps though, but electric rates make the latter cost more (EVs are cheaper).
Michigan should install heat pumps. However it gets cold enough that a heat pump will not work for several days every winter (and even more nights), so while heat pumps will help they still need something and natural gas ends up our best bet...
there’s a good reason for this and it relates to ireland and US corporate tax laws. Basically the rules changed for corps to move hqs there , and instead they needed to prove “economic substance” in ireland to establish EU hqs, which for tech companies meant data center builds.
Always good to see more hard data on this topic! I’d be curious to play with their dataset. I toyed around with doing some data center research a couple months ago. My vision was to compare data center counts and population densities near data centers built before and after the dawn of LLMs. And do some other stuff. But I had trouble finding reliable data on where data centers are located (some lists exist, but they’re not perfect, so I was doing manual validation) and when they were built (permitting and whatnot provided decent bounds). In the end, there was too much manual work. I didn’t feel like doing that all weekend for several weekends in a row, and I have a day job to worry about during the week.
Regarding the actual result, I’m appalled but not surprised (though obviously it’s good to have concrete data). We environmentalists having been raising this concern for at least a year. More people are catching on - this seems to have helped the Blue Wave this election season. But a lot of tech bros still don’t get it, particularly here on HN. Maybe this will help change some minds.
I work in AI, but this is obviously not sustainable unless renewable energy is used.
But according to AI Multiple:
Globally, only about 22% to 27% of the actual electricity consumed by AI and data center facilities comes directly from renewable energy sources like solar, wind, and hydropower.
They recommend the obvious, "Prioritize inference efficiency over training efficiency" since most power is used for inference now.
They reference research that shows that over 80% of AI compute is now used for inference.
"Work in AI" is one of those vague claims that could mean you work in a field relevant to the topic at hand, infrastructure, or that you simply use AI a lot at work. If your role was the more relevant one, one'd expect you to claim it specifically.
Your point is so basic it requires no expertise to reason about, however, anyways.
Datacenter power consumption wouldn't be an issue if that power came from local renewable sources.
Unfortunately, the gas-fired turbines that are being built now feel like quite a regression. Or the additional load on the public grid, which in some places barely has any spare capacity left.
It's not an unsolvable problem though. A sustainable hyperscale datacenter can be built. There just isn't enough of an incentive as long as buying gas and polluting the air is cheaper (because the cost of both is externalized on society)
>Datacenter power consumption wouldn't be an issue if...
...they didn't use them for AI.
The panic over DC's has nothing to do with DC's. It's entirely about fear around AI and knee-capping AI progress. It's like when conservatives suddenly care about native grasshoppers when they find out a solar farm is gonna be put on the land. You're totally whiffing if you think they actually care about the grasshoppers.
That may be a factor, but there are other, very rational complaints. They are enormous, noisy eyesores. They result in raised electrical rates for anyone living in the region. They are another user of water in areas that may already be stressed for water. They are also setting us up for massive e-waste in 5 years. Those are real problems that you can't just hand-wave away.
You can't hand wave them away, but you can dissolve them with even a modicum of grounded research. All industry is big noisy buildings, DCs aren't particularly loud either (and don't need to be), electric rates come mostly from distribution costs, not generation costs, DCs use about 2 golf courses of water a year, so ask the farmers to water one less day (and save the ag runoff from hitting the streams too), inference is currently being served on 5 year old hardware and 10 year old cards are even hard and expensive to get.
And last of all, it's like 3 datacenters that keep coming up as "DCs are bad" despite their being thousands in the country (and hundreds of hyperscale sized ones).
The whole thing is public panic rather than academic honesty.
You are telling me I'm wrong, not because any of these impacts are wrong, but that they shouldn't count. That's hand-waving.
> All industry is big noisy buildings
But they produce jobs, goods, and social value. If people don't see the value of AI (or even see it as a job risk), then why would they be inclined to put up with the noise and land use?
> electric rates come mostly from distribution costs
Which are costs that result in higher residential rates. Go ask someone who recently looked at their ComEd bill.
> DCs use about 2 golf courses of water a year, so ask the farmers to water one less day
Except you can't ask farmers to do that. We need food, and water is finite. That's not anti-AI panic, it's a cold fact.
Gas has the advantage of being locally available, without having to tax the grid even more, which is not even keeping up a little bit at this point, and has a decade+ build out backlog. Gas is just very convenient, compared to other options. And that is the real problem, because there is no way to fix this quickly.
> A sustainable hyperscale datacenter can be built. There just isn't enough of an incentive as long as buying gas and polluting the air is cheaper (because the cost of both is externalized on society)
This is a misidentification of the problem. Generating power on-site with turbines is an alternative to bidding up the price of grid power that raises the short-term price of electricity for other consumers. If they're doing one they're not doing the other.
Moreover, small gas turbines and converted aircraft engines aren't actually the thing with the lowest long-term operating costs, they're just the thing you can plop out of a truck and turn on right away.
Which means the best thing might be to use turbines temporarily to avoid raising short-term electricity prices for ordinary people, but only for the time it takes to build some new non-carbon generation to replace them.
And the latter is what everybody really wants, because renewable energy isn't just cleaner, it's cheaper. It just takes longer to deploy, not least because the permits cost more and take longer than they ought to. Which means that if you really want to get rid of the turbines and the high electric bills, what you need is to make it faster to build new non-carbon generation.
> Generating power on-site with turbines is an alternative to bidding up the price of grid power that raises the short-term price of electricity for other consumers. If they're doing one they're not doing the other.
They could also do neither and build carbon-free generation (and storage and transmission that goes along with it) from the get-go. That's what I'm arguing for. Not simply making grid operators deal with it.
I'd love to see some of that insane AI money be used to make actual progress towards net-zero emissions now.
> the best thing might be to use turbines temporarily to avoid raising short-term electricity prices for ordinary people, but only for the time it takes to build some new non-carbon generation to replace them
My fear is that some of these gas turbines aren't as temporary as they want people to believe. But even if we take their word for it, why spend money on a temporary solution and on a permanent solution later, even though we have the technology and supply chain to build the permanent solution now?
> renewable energy isn't just cleaner, it's cheaper
I agree that it's fundamentally cheaper, though some politicians seem to be dead set on skewing the market unfairly towards fossil fuels.
> It just takes longer to deploy, not least because the permits cost more and take longer than they ought to.
And I agree that delays due to permits are problematic, but I'd love to see AI money and momentum being used to overcome these hurdles. It shouldn't take longer from a technical perspective.
Right now, the voting public largely opposes datacenters being built at all, and that can hardly be the outcome we should strive for.
Instead, we should be building datacenters that are fully sustainable from the get-go and, if anything, have a positive effect on grid prices.
Rather than rejecting datacenter projects outright, let's push them to fulfill that goal for the benefit of all of us. Hundreds of billions of dollars from the AI hype should be enough to do it.
> But even if we take their word for it, why spend money on a temporary solution and on a permanent solution later, even though we have the technology and supply chain to build the permanent solution now?
Then you need the permanent solution to be able to come online immediately so that you don't need a temporary solution, and that's the thing being held up by permits etc.
> Not simply making grid operators deal with it.
Dealing with it is literally the purpose of a grid operator. The place you want the consumer and the place you want the generator aren't necessarily the same place, which is the purpose of the grid. The grid operator then adds capacity according to expected demand. The long-term effect of higher demand tends to drive prices down because it improves economies of scale.
The short term problem is that the grid operator is subject to the same permitting delays etc. as anyone else, and then if demand increases it takes too long for supply to respond and in the meantime you get high prices.
> And I agree that delays due to permits are problematic, but I'd love to see AI money and momentum being used to overcome these hurdles.
This isn't so much a money problem as a policy problem. Renewable energy projects require pre-approval from NIMBYs when they shouldn't. To solve that you need to change the law. It's not a money problem unless you intend to use the money for bribery.
And how much would we expect that number to be? I suspect nearly everyone is sufficiently ignorant about both datacenters and Michigan that they have no clue.
I can't read the article itself (or maybe listen to it? Hard to see what this page actually is). I read Harvard's summary [1] of the article. The preprint is also available [2]
One thing to note is that the framing "Just 400 US Data Centers" makes it seem like 400 out of the gazillion data centers use this much electricity, but the original research seems to be that they found exactly 403 "Hyperscale Data Centers" and evaluated them.
The framing is technically correct (since there exist non-hyperscale data centers) but is clearly intended to be deceptive.
If the framing were "top 400 datacenters use more electricity than Michigan" would you still call it deceptive?
The point still stands that 400 of the gazillion datacenters in the US use more energy than the entire population and industry of an entire state. That's a ridiculous amount of energy to pour into any number of datacenters.
Okay, what should the number be? If it was the top 800 instead of top 400 would you have no problem with it? Or should the total energy consumption of all data centers always be less than michigan's energy consumption?
No it isn't. Actually, it's way too little energy. See how easy it is to make random claims? Probably a good thing energy allocation isn't based on random reddi- I mean HN user vibes.
> That's a ridiculous amount of energy to pour into any number of datacenters.
Is it? What are you comparing it to? Someone up a thread compared it to the top 10 steel plants and it turns out they use more energy than all the data centers.
This is like the water discussion where people discuss absolute values of consumption for huge scale industries and then put that in front of people that have no context to generate outrage.
>"Just 400 US Data Centers" makes it seem like 400 out of the gazillion data centers use this much electricity, but the original research seems to be that they found exactly 403 "Hyperscale Data Centers" and evaluated them.
I would assume you wouldn't select the 400 smallest data centers and 400 random data centers would be weird to write an article about, so I defaulted to thinking the 400 largest(with available data). Was this assumption wrong? Where is the deception? Is it Michigan?
Here's how it was misleading to me personally: when I heard "Just 400 Data Centers" I interpreted that initially as there are lots of data centers, say, 1000, but it only takes 400 of them to equal the power of Michigan, so wow! the full set of data centers must use an enormous amount of power!
But now this comment clarified that the initial study looked at all the hyperscalars in the US (403). So it wasn't like it was choosing a subset to equal a known amount of power, it was putting all the power into context. If the headline were instead: "All the Hyperscalar Data Centers in the US equal the power usage of Michigan" it doesn't kind of gesture at a much larger amount of power being used.
>the data did not allow them to differentiate between power used for general-purpose versus AI-specialized operations at each HDC
That seems like an important distinction. Many people reading the headline will immediately assume this refers to AIDCs only, especially those who never heard of or rarely thought of data centers until recently.
>HDC electricity demand corresponded to approximately 1.8% of total U.S. electricity consumption
I don't see a problem with this. The only real issue is in cases of added load to local grids increasing costs. It is useful to look at historical electricity production in the US.[0] If anything the period of stagnation starting from 2007 is an anomaly. That stagnation was probably caused by the GFC, de-industrialization and improved energy efficiency. I don't think anyone protested the 25% increase in electricity production from 1990 to 2000, for example.
By the way, your first link appears to be cut off, full link is this:
At this point I am not even sure why should we continue to read anything from mainstream media. Other than some sort of civil duty to continue correct them or bring it context / communities notes.
I am also wondering why Datecenter and AI is now becoming the new Anti-Christ / Nuclear Reactor.
I think this perspective lacks nuance. If you are so pro-data center you don’t understand why it there is so much fear around them, start there. You don’t need to change your mind, but it is important to understand other perspectives. Otherwise you are going to stay in your own bubble and continue to avoid news that aligns with your perspective.
I am neither pro or against anything. But nothing in the Anti Data Centre side has provided anything concrete. Are there downsides? Yes. But at this point even without any down side people will still be against it.
Honestly, why would people be "for" datacenters in their neighborhood?
Heavy industry gets/got a lot of pushback, and that brings both local jobs and outputs that are essential to many.
Datacenters, on the other hand, bring basically no local jobs once construction is finished, and--worse even--their output is perceived to compete with the job people already have to some degree.
Data centers aren’t being built in neighborhoods, they are being built in industrial zones. Buying property next to industrial areas and being upset when industry happens is just poor decision making
How does that make sense? There are downsides, but nothing concrete? If there are no downsides why are people against it? I promise you there is a real answer.
With a headline like this, I'd always expect the 400 datacenters to be among the biggest, not a random sample (or the smallest, even). Why would any piece of media ever deliberately make their headline less "interesting" (sensationalist)?
Deceptive framing would've been: "5 datacenters use more electricity than Michigan" which could've still been technically correct assuming 5 datacenters the size of the currently unfinished AWS New Carlisle campus (2.3GW).
The demand creates incentive for people to add capacity to the grid. IMO what's really needed is a combination of capital to invest into the grid plus incentives for the public to use less. (Eg: allow DCs to pay marginal bids / $ to those who voluntarily reduce their usage. Allow a DC to pay me, say, $10 to free up $10 worth of marginal electricity usage, they effectively pay double the market rate and I have a benefit from DCs)
These topics are always contentious because you have a huge portion of HN whose livelihood depends on AI slop producing data centers, so they will refuse to recognize any negative externalities, or somehow say our environmental degradation is worth the cost, or simply hand wave it.
These topics can also be contentious because a portion of HN and a greater portion of the wider society believes AI is either useless or evil or both and thus the new data centres are to be opposed on principal.
Mildly misleading statement, as _some_ of the usage of those datacenters experience _come_ from Michigan, so that should be factored into the calculations.
Wired headline: "Just 400 US Data Centers Use More Electricity Than Michigan"
Wired lede:
> Just 400 hyperscale data centers connected in the US used as much electricity as the state of Michigan in a single year, new Harvard research has found.
Harvard press release [0]:
> The study found that these HDCs, depending on how hard they were running, together used between 68 and 99 terawatt-hours of electricity—with the upper estimate approaching the amount some states, such as Indiana, Michigan, and Tennessee, use in a year.
- Find out how many datacenters are out there and how much electricity they consume
- Find the biggest US state consuming less electricity than that
- Bingo! The headline!
72 comments
[ 3.2 ms ] story [ 63.3 ms ] threadEvery google now comes with an AI answer too.
What do you mean "just"?
Google tells me Michigan uses 11–12 GW on average, and summer peaks reach roughly 22–24 GW.
In Alberta, companies have requested ~19.6 GW for only ~52 new datacenter's. O’Leary’s proposed off-grid Wonder Valley campus is pitched at 7.5 GW of generation on its own.
Electricity is useful for so many things, but it's not needed in huge amounts in an ordinary Michigander's life today. I wish they'd switch to EVs and heat pumps though, but electric rates make the latter cost more (EVs are cheaper).
This says they are still viable:
https://michiganhvacauthority.com/michigan-heat-pump-conside...
Modern residential cold-climate air-source heat pumps can operate down to roughly −15°F to −25°F, depending on the model.
Michigan had an average of 4.6 nights per year reaching 0°F or below during 2020–2024
https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/dat...
Regarding the actual result, I’m appalled but not surprised (though obviously it’s good to have concrete data). We environmentalists having been raising this concern for at least a year. More people are catching on - this seems to have helped the Blue Wave this election season. But a lot of tech bros still don’t get it, particularly here on HN. Maybe this will help change some minds.
But according to AI Multiple:
Globally, only about 22% to 27% of the actual electricity consumed by AI and data center facilities comes directly from renewable energy sources like solar, wind, and hydropower.
They recommend the obvious, "Prioritize inference efficiency over training efficiency" since most power is used for inference now.
They reference research that shows that over 80% of AI compute is now used for inference.
https://aimultiple.com/ai-energy-consumption
Your point is so basic it requires no expertise to reason about, however, anyways.
Unfortunately, the gas-fired turbines that are being built now feel like quite a regression. Or the additional load on the public grid, which in some places barely has any spare capacity left.
It's not an unsolvable problem though. A sustainable hyperscale datacenter can be built. There just isn't enough of an incentive as long as buying gas and polluting the air is cheaper (because the cost of both is externalized on society)
...they didn't use them for AI.
The panic over DC's has nothing to do with DC's. It's entirely about fear around AI and knee-capping AI progress. It's like when conservatives suddenly care about native grasshoppers when they find out a solar farm is gonna be put on the land. You're totally whiffing if you think they actually care about the grasshoppers.
And last of all, it's like 3 datacenters that keep coming up as "DCs are bad" despite their being thousands in the country (and hundreds of hyperscale sized ones).
The whole thing is public panic rather than academic honesty.
> All industry is big noisy buildings
But they produce jobs, goods, and social value. If people don't see the value of AI (or even see it as a job risk), then why would they be inclined to put up with the noise and land use?
> electric rates come mostly from distribution costs
Which are costs that result in higher residential rates. Go ask someone who recently looked at their ComEd bill.
> DCs use about 2 golf courses of water a year, so ask the farmers to water one less day
Except you can't ask farmers to do that. We need food, and water is finite. That's not anti-AI panic, it's a cold fact.
DCs aren't distribution networks. They pay for their own grid connection.
We don't need to farm in water stricken areas to feed people. Protests against this long predate DCs.
Again, don't fall for the hysteria.
This is a misidentification of the problem. Generating power on-site with turbines is an alternative to bidding up the price of grid power that raises the short-term price of electricity for other consumers. If they're doing one they're not doing the other.
Moreover, small gas turbines and converted aircraft engines aren't actually the thing with the lowest long-term operating costs, they're just the thing you can plop out of a truck and turn on right away.
Which means the best thing might be to use turbines temporarily to avoid raising short-term electricity prices for ordinary people, but only for the time it takes to build some new non-carbon generation to replace them.
And the latter is what everybody really wants, because renewable energy isn't just cleaner, it's cheaper. It just takes longer to deploy, not least because the permits cost more and take longer than they ought to. Which means that if you really want to get rid of the turbines and the high electric bills, what you need is to make it faster to build new non-carbon generation.
They could also do neither and build carbon-free generation (and storage and transmission that goes along with it) from the get-go. That's what I'm arguing for. Not simply making grid operators deal with it.
I'd love to see some of that insane AI money be used to make actual progress towards net-zero emissions now.
> the best thing might be to use turbines temporarily to avoid raising short-term electricity prices for ordinary people, but only for the time it takes to build some new non-carbon generation to replace them
My fear is that some of these gas turbines aren't as temporary as they want people to believe. But even if we take their word for it, why spend money on a temporary solution and on a permanent solution later, even though we have the technology and supply chain to build the permanent solution now?
> renewable energy isn't just cleaner, it's cheaper
I agree that it's fundamentally cheaper, though some politicians seem to be dead set on skewing the market unfairly towards fossil fuels.
> It just takes longer to deploy, not least because the permits cost more and take longer than they ought to.
And I agree that delays due to permits are problematic, but I'd love to see AI money and momentum being used to overcome these hurdles. It shouldn't take longer from a technical perspective.
Right now, the voting public largely opposes datacenters being built at all, and that can hardly be the outcome we should strive for.
Instead, we should be building datacenters that are fully sustainable from the get-go and, if anything, have a positive effect on grid prices.
Rather than rejecting datacenter projects outright, let's push them to fulfill that goal for the benefit of all of us. Hundreds of billions of dollars from the AI hype should be enough to do it.
Then you need the permanent solution to be able to come online immediately so that you don't need a temporary solution, and that's the thing being held up by permits etc.
> Not simply making grid operators deal with it.
Dealing with it is literally the purpose of a grid operator. The place you want the consumer and the place you want the generator aren't necessarily the same place, which is the purpose of the grid. The grid operator then adds capacity according to expected demand. The long-term effect of higher demand tends to drive prices down because it improves economies of scale.
The short term problem is that the grid operator is subject to the same permitting delays etc. as anyone else, and then if demand increases it takes too long for supply to respond and in the meantime you get high prices.
> And I agree that delays due to permits are problematic, but I'd love to see AI money and momentum being used to overcome these hurdles.
This isn't so much a money problem as a policy problem. Renewable energy projects require pre-approval from NIMBYs when they shouldn't. To solve that you need to change the law. It's not a money problem unless you intend to use the money for bribery.
Useless rage baiting.
One thing to note is that the framing "Just 400 US Data Centers" makes it seem like 400 out of the gazillion data centers use this much electricity, but the original research seems to be that they found exactly 403 "Hyperscale Data Centers" and evaluated them.
The framing is technically correct (since there exist non-hyperscale data centers) but is clearly intended to be deceptive.
[1] https://hsph.harvard.edu/news/hyperscale-data-centers-energy...
[2] https://arxiv.org/pdf/2606.05420
The point still stands that 400 of the gazillion datacenters in the US use more energy than the entire population and industry of an entire state. That's a ridiculous amount of energy to pour into any number of datacenters.
Why? Your objection sounds arbitrary.
Its citing Hyperscaler Data Centers as 1.8% of the US's power usage, right? Sounds like Michigan just doesn't use that much power.
Is it? What are you comparing it to? Someone up a thread compared it to the top 10 steel plants and it turns out they use more energy than all the data centers.
This is like the water discussion where people discuss absolute values of consumption for huge scale industries and then put that in front of people that have no context to generate outrage.
I would assume you wouldn't select the 400 smallest data centers and 400 random data centers would be weird to write an article about, so I defaulted to thinking the 400 largest(with available data). Was this assumption wrong? Where is the deception? Is it Michigan?
Here's how it was misleading to me personally: when I heard "Just 400 Data Centers" I interpreted that initially as there are lots of data centers, say, 1000, but it only takes 400 of them to equal the power of Michigan, so wow! the full set of data centers must use an enormous amount of power!
But now this comment clarified that the initial study looked at all the hyperscalars in the US (403). So it wasn't like it was choosing a subset to equal a known amount of power, it was putting all the power into context. If the headline were instead: "All the Hyperscalar Data Centers in the US equal the power usage of Michigan" it doesn't kind of gesture at a much larger amount of power being used.
>the data did not allow them to differentiate between power used for general-purpose versus AI-specialized operations at each HDC
That seems like an important distinction. Many people reading the headline will immediately assume this refers to AIDCs only, especially those who never heard of or rarely thought of data centers until recently.
>HDC electricity demand corresponded to approximately 1.8% of total U.S. electricity consumption
I don't see a problem with this. The only real issue is in cases of added load to local grids increasing costs. It is useful to look at historical electricity production in the US.[0] If anything the period of stagnation starting from 2007 is an anomaly. That stagnation was probably caused by the GFC, de-industrialization and improved energy efficiency. I don't think anyone protested the 25% increase in electricity production from 1990 to 2000, for example.
By the way, your first link appears to be cut off, full link is this:
Hyperscale data centers’ energy consumption, carbon emissions newly estimated by researchers https://hsph.harvard.edu/news/hyperscale-data-centers-energy...
[0] https://www.eia.gov/totalenergy/data/browser/?tbl=T07.01#/?f...
At this point I am not even sure why should we continue to read anything from mainstream media. Other than some sort of civil duty to continue correct them or bring it context / communities notes.
I am also wondering why Datecenter and AI is now becoming the new Anti-Christ / Nuclear Reactor.
Heavy industry gets/got a lot of pushback, and that brings both local jobs and outputs that are essential to many.
Datacenters, on the other hand, bring basically no local jobs once construction is finished, and--worse even--their output is perceived to compete with the job people already have to some degree.
there’s no need to understand people’s reaction to misleading tertiary sources
With a headline like this, I'd always expect the 400 datacenters to be among the biggest, not a random sample (or the smallest, even). Why would any piece of media ever deliberately make their headline less "interesting" (sensationalist)?
Deceptive framing would've been: "5 datacenters use more electricity than Michigan" which could've still been technically correct assuming 5 datacenters the size of the currently unfinished AWS New Carlisle campus (2.3GW).
even the expensive hardware has to be replaced every few years
"Just the McDonaldses in New York City use more electricity than North Dakota"
Why Michigan instead of Maryland, Delaware, or Connecticut? Give the smaller states a chance!
Lots of brochures have been printed though.
Wired lede:
> Just 400 hyperscale data centers connected in the US used as much electricity as the state of Michigan in a single year, new Harvard research has found.
Harvard press release [0]:
> The study found that these HDCs, depending on how hard they were running, together used between 68 and 99 terawatt-hours of electricity—with the upper estimate approaching the amount some states, such as Indiana, Michigan, and Tennessee, use in a year.
Wired is playing in your faces.
[0] https://hsph.harvard.edu/news/hyperscale-data-centers-energy...
> HDC electricity demand was approximately 82 TWh, corresponding to about 1.8% of total US electricity consumption
(https://www.nature.com/articles/s41893-026-01985-7)
Sounds like Michigan just doesn't use much power...